Statutory framework operating under the Building Act 2016 (TAS). Tasmania uses an innovative risk-based framework dividing domestic projects into Low Risk, Notifiable, and Permit building work.

Category 1 & 2

Low Risk Building Work

Minor works that require no council notification, building permit, or certifier engagement (e.g., small outbuildings, low decks, minor retaining).

Immediate commencement permitted.

Category 3

Notifiable Work

Standard residential construction certified by a licensed Building Surveyor and notified to council without needing a formal council building permit.

Fast-track surveyor certificate.

Category 4

Permit Building Work

Complex or non-standard structures, high bushfire zones, or work impacting heritage places requiring full municipal council permit approval.

Council permit required before starting.

Tasmanian Low Risk Exemption Benchmarks

Retaining Walls

Retaining walls retaining earth not more than 1.0m in height and not loading an adjacent footing or property boundary are Low Risk work requiring no permit.

Fencing & Screens

Dividing fences not exceeding 2.1m in height (or masonry walls under 1.2m) are exempt from planning and building approval.

Decks & Platforms

Unroofed timber decks with finished surface not more than 1.0m above ground and area under 18m² are Low Risk. Over 1.0m triggers surveyor certification.

Sheds & Outbuildings

Freestanding Class 10a sheds with floor area up to 18m², maximum height of 2.4m, and located at least 900mm from boundaries are classified as Low Risk work.